Site Specific Safety Plan (Pre-Job Checklist)
Medical Facilities to be used:
Minor Injuries
Serious Injuries
Emergency Numbers
Signs
Overhead Protection
Excavation / Trenches
Fall Protection
Fall Protection is required for work in areas where the fall hazards is greater than 10’.SEE Confined Space Plan
Schedule For Weekly Safety Meetings & Job Safety Inspections
Meeting
Inspection
Subcontractors On Site
Prepared By:
Core & Shell
Site Specific Safety Plan
Site Specific Safety Plan
First Aid / Medical Facilities / Emergency ContactsOR: Contact 911 & give them the project address
Fire Extinguishers, meeting the requirements of WAC 296-800-300, will be located at the following location:
While the building frame is being erected until substantial completion, there will be a minimum of one fire extinguisher on each floor. For floor areas greater than 100 feet in length in any one direction, there will be a minimum quantity of extinguishers so that there is never a greater distance of travel than 50’ to reach a fire extinguisher location. All fire extinguisher locations will be clearly marked in Red Lettering.
Site Specific Safety Plan
Protruding Rebar or Other Vertical Element Protection
WAC 296-155-681 Safe walking surfaces on concrete structural members.
Structural members with studs, dowels, or shear connectors installed on the top side
shall not be used as a walkway and/or means of access unless such studs, dowels,
or shear connectors are covered with suitable material and in such a manner as to
provide a walking surface at least as stable and free of hazards as the top surface of
the member would provide without attachments installed.
Note: For the purpose of this section, “stud” means all protruding metal attachments
to structural members.
It shall be Aldrich + Associates’ policy that whenever there is any vertical element
protruding from the top side of a structural member used as a walkway or adjacent to
an area where work is ongoing, those vertical elements shall be enclosed by use of
either a plywood cover supported from the structural member or capped with Rebar
Caps.
Safety Person(s)
, the Safety Person for this project, will be responsible for development, implementation, and administration of Aldrich + Associates’ PPE policies for the